Wheels of Happiness
Rizal Philippines
April 24, 2018
It is only lately that I feel that I am one with my bike. After nearly 10 years of biking. That comes from:
1. Constant use of the bike, and knowing its quirks and capability;
2. Being happy with its parts and performance:
1. The fit: TT tube 50 cm
2. Weight due to 1.2 kg alum frame, 1.435 wheel set, lightweight seat post, stem, and drop
bar: short reach, (compact) and 120 mm drop.
3. The addition of Jagwire nipples for the cable leading to crisper shifting, and better
braking
Hence, I on several occasions can pace with the paceline (or even lead the peloton) or lead other similar age riders. And I do not get fatigued as it was before.
With a good bike and with great appearance, you are more motivated to bike, and bike better
A senior thinks, rides, solves problems, repairs bikes, thinks discusses about other sports. What senior should do to keep fit
Showing posts with label FIT. Show all posts
Showing posts with label FIT. Show all posts
Tuesday, April 24, 2018
Wednesday, November 26, 2014
#Windfarm at #Bugarin, Pililla
Wheels of Happiness
From Philstar on Pililla Windfarm Project
From Chinabank
Wind Farm in California

Rizal Philippines | November 27, 2014
By this time you would have noticed the tarp signs announcing the soon to be inaugurated wind farm at Bugarin, Pililla. There are 27 in all. The new roads being built lead to the Wind farm with 67.5 mW capacity
This is the first wind farm to be financed by FIT (Feed in Tariff) and aptly called #PilillaWindfarm Project. It was financed locally with BDO as the lead underwriter for $130 million with a term of 12.5 years. This reflects the local bank's confidence in renewable energy. The project broke ground last June 2012 and expected to be operational late 2014.
It is a joint project of a company founded by Fmr Secy Vincent Perez and Kepco and Meralco PowerGen
The power output from the Pililla Windfarm project is priced at P8.53/kwh


From Philstar on Pililla Windfarm Project
From Chinabank
Wind Farm in California

Rizal Philippines | November 27, 2014
By this time you would have noticed the tarp signs announcing the soon to be inaugurated wind farm at Bugarin, Pililla. There are 27 in all. The new roads being built lead to the Wind farm with 67.5 mW capacity
This is the first wind farm to be financed by FIT (Feed in Tariff) and aptly called #PilillaWindfarm Project. It was financed locally with BDO as the lead underwriter for $130 million with a term of 12.5 years. This reflects the local bank's confidence in renewable energy. The project broke ground last June 2012 and expected to be operational late 2014.
It is a joint project of a company founded by Fmr Secy Vincent Perez and Kepco and Meralco PowerGen
The power output from the Pililla Windfarm project is priced at P8.53/kwh