Real Cyclists
Morong Rizal PHL | September 28, 2013
The PHL government must have spent millions for road widening and improvement at floodway and lately the Manila East Road. The widening is supposed to make travel more convenient and safe, relieve congestion and the like.
However, most of the road widening are used to parochial and selfish use of the residents. Up to now procession jam traffic/travel from Quezon and Bicol region at Laguna and Batangas area. The local government and the residents doing the procession could not care less?
Why is it that way?
Look at this Lagundi widening which is now used for Palay drying. After driving away roadside settlers, cutting of the trees, the multi million expenditure just ended up being used as palay drier. How great?
A senior biker's log of bike rides, bikes, bike repairs, and his experience as senior and physical challenges being encountered as a senior
Showing posts with label road widening. Show all posts
Showing posts with label road widening. Show all posts
Sunday, September 29, 2013
Saturday, June 22, 2013
Thanks to public officials for well paved cycling roads
Real Cyclists
Road widening at Pangil
We are thanking DPWH and other public officials for making well paved, smooth roads possible for cyclists in Bugarin, Pililla Tanay, Cardona, Binangonan, Morong, Teresa and Antipolo. And all of these were done during the election period.
As biked last June 20, 2013, there were a number of projects going on:
l. Km 63 to 64 (Rizal 2nd district) - putting of base coarse on the shoulder.
2. Km 70 to 71 (Laguna 2nd district) - road widening
3. Km 111 to 110 (Laguna 2nd district) Pangil road widening.
That is why it is such a joy to bike in these areas
Road widening in Lumban Laguna
Road widening at Pangil
We are thanking DPWH and other public officials for making well paved, smooth roads possible for cyclists in Bugarin, Pililla Tanay, Cardona, Binangonan, Morong, Teresa and Antipolo. And all of these were done during the election period.
As biked last June 20, 2013, there were a number of projects going on:
l. Km 63 to 64 (Rizal 2nd district) - putting of base coarse on the shoulder.
2. Km 70 to 71 (Laguna 2nd district) - road widening
3. Km 111 to 110 (Laguna 2nd district) Pangil road widening.
That is why it is such a joy to bike in these areas
Road widening in Lumban Laguna
Subscribe to:
Posts (Atom)