Pages

Tuesday, May 1, 2018

S works Vias Venge: from Dreamworks to Assembly/Realityworks

Wheels of Happiness

Rizal Philippines
May 1, 2018





                                                   Ayos ba upgrade, change?


                                                      Pang d/p lang sa S works


                                      At P24.5 K murang mura, pang DP lang sa frameset ng
                                                S works


                                      S 105 GS which currently sells at P16K panalo na buyer.
                                      Add the cost of frame and the RS 10 wheelset


Image result for s works vias venge
                                               Ito kapalit na bike pero naka SRAM red

This post dreamt of having an S works after seeing the younger brother bring out two S works Tarmac bike: one in Vigan and one in Marinduque, and after Peter Sagan won the Roubaix Paris race on a Sworks Roubaix. After meeting Mr. Ronald Santos (Dianor FB account) with a fellow Recyclist Engineer Francisco regarding his purchase of   carbon frame bike, he suggested that I buy a 2nd hand slightly used S works for undisclosed low price.  And I agreed.

We had a deal with the  seller for an undisclosed amount that would equal the selling price of Mosso that I sold and I would add some more.   It was to be given to him last April 28, and he would deliver to me the frame on May I. I would give him the  DP (the proceeds of the Mosso bike) provided the bike is BB30 ready.  (It was after some guessing and after being surprised today. The mechanic and Mr. Santos also did not know hahaha)

The assembly took almost 5 hours.  And some bikers waiting for services of the mechanic: Alex had to leave. It was a big challenge to install the cables

     1   The cables are hidden in the handle bar and passes through the stem;
     2.  And to the head post. One had to pass through the head post expander.
     3.  The 3 other cables had to be inserted through the head post shell
     4.  Alex had to repeat the process, because he missed inserting some of head post parts  It took
          him another hour.

And since we were outdoors, we perspired and were dehydrated. I had to buy him and Mr. Santos several bottles of coke and mineral water.


Finally at 5 pm, the dream works on S works was all ready a reality... I had took a jeep from Sta Lucia to home and paid another P25.00 for the fare back to Angono.  Romeo B and  Mr. Long Henson saw the bike frame.  A Peter Sagan bike.

As I rode the jeep, I had the opportunity to feel and observe the bike frame.  It is all about aero dynamics (and speed).  No cables to obstruct air flow. No brakes.   The handle bar was blade shaped. The down tube is huge and aero too. The seatpost is aero.  The seat stay are thin and aero. Everything is aero. But is heavy. The SRAM made the whole set up lighter.  

I have an issue with the seat post which would not accept my seat.

I have installed the bar tape.   And the  water cage (Zefal) lang.

No comments:

Post a Comment